Tucson Electric Power

Back To Case Studies

Background:

  • A coal fired base load plant with a generating capacity of approximately 1,600 MW/Hr. total from four units.
  • Plant personnel complement of 321 employees.
  • Two of the four units are operated by TEP but are owned by other companies.
  • Limited CMMS functionality and use with previous processes

Process Results:

  • Improved skill levels in work processes
  • Improved CMMS functionality
  • More accurate equipment history supporting future reliability efforts
  • Established methodology for maintaining and improving processes that provide a foundation for availability/ cost improvements

Bottom-Line Impacts:

  • Reduced maintenance work backlogs and reduced emergency work
  • Increased levels of work completed and PMs completed on time.