Black Hills Energy - CMMS

Back To Case Studies

Background:

  • Three site locations, each with multiple units using custom CMMS
  • Coal/steam units ranging from 11MW – 100MW
  • Gas CT units < 50MW
  • Larger site has formal Work Management Process
  • Smaller sites have varied and undocumented process

Process Results:

  • Developed custom training materials which integrated the formal and informal process flow with the usage of the EAM system.
  • 100% of staff trained at a level appropriate for their position
  • Began to formalize process at the two smaller sites through the EAM implementation
  • Field coached & coordinated staff activities to support training and implementation for the EAM system (Supply chain, Mx, I&E, Ops, planning / scheduling, engineering, overhaul and management)

 